• Sidebar Ads




TDOT announces road projects


 Related Articles
Email Print
Crews will pave Interstate 24 from the Davidson County line to Almaville Road, the Tennessee Department of Transportation reported.

Road projects in Rutherford County include:

Resurfacing and Ramp Repair on I-24 (Lojac)

•    Thursday June 4 and Friday June 5, 8PM-6AM each night, I-24 alternating lane closures in both EB and WB directions, to pave the roadway between the Davidson County line and east of Almaville Rd. One lane will remain open.
•    Sunday June 7 through Wednesday June 10, 8PM-6AM each night, I-24 alternating lane closures in both EB and WB directions, to pave the roadway between the Davidson County line and east of Almaville Rd. One lane will remain open.

Random Concrete Pavement Repair (Kelcris Corporation)

•    Thursday June 4 through Friday June 12, 8AM-8PM, Traffic will be shifted on the ramps at the intersection of Almaville Rd. and Murfreesboro Rd. in order to perform concrete repairs.

TDOT issued one closure:

Friday June 5, 8PM through Monday June 8, 5AM – Total closure of Interstate 40 westbound from I-40/I-24 split near 2nd/4th Ave. to I-40/I-65 southbound split near 8th Ave. to repair Lafayette St. bridges on I-40 west, repair ramps, and adjust catch basins.  Ramp repair will consist of the 4th Ave. ramp to I-40 westbound. Portable and overhead message boards will be used to detour traffic.  Metro Police officers will be utilized for this operation.
 
 
 Other projects for the next week include:

Resurfacing and Bridge Repair on I-24 and I-40 (Lojac)

•    Friday June 5, 8PM through Monday June 8, 5AM – Total closure of Interstate 40 westbound from I-40/I-24 split near 2nd/4th Ave. to I-40/I-65 southbound split near 8th Ave. to repair Lafayette St. bridges on I-40 west, repair ramps, and adjust catch basins.  Ramp repair will consist of the 4th Ave. ramp to I-40 westbound. Portable and overhead message boards will be used to detour traffic.  Metro Police officers will be utilized for this operation.

I-24 from SR 249 to SR 45 Resurfacing (Lojac)

•    Thursday June 4 and Monday June 8 through Wednesday June 10, 8PM-5AM, There will be alternating lane closures on I-24 eastbound and westbound in order to fog seal the shoulders, place shoulder stone, and stripe the roadway.  One lane will remain open.

Bridge Repair on 3 Bridges on Briley Pkwy. between I-24 & Curry Rd. (Jamison Construction)

•    Now through July 2009, There will be lane closures on Briley Parkway eastbound and westbound from LM 3.48 to LM 3.63 for bridge repair. One lane will remain open in each direction.

Region 3 On-Call Guardrail (Classic City Utility)

•    Thursday June 4 through Wednesday June 10, 8PM-6AM, (each night), There will be one lane closures at various locations on interstates and state routes in Davidson, Robertson, Montgomery, Maury, Giles, Williamson, Wilson, and Sumner Counties for guardrail repair and installation.
•    Thursday June 4 through Wednesday June 10, 9AM-4PM, There will be various shoulder closures in Middle Tennessee on state routes for guardrail repair and installation.

Resurfacing and Bridge Repair on Briley Pkwy from SR 12 to I-40 (Rogers Group)

•    Friday June 5, 8PM through Monday June 8, 6AM, The left lane of Briley Pkwy. northbound and southbound will be closed for bridge deck repairs over Richland Creek.  One lane will remain open in each direction.

Phase III of ITS (Trans Tech Electric)

•    Thursday June 4 through Wednesday June 10, 9AM-3PM and 7PM-6AM. There will be periodic day and night time shoulder closures at various locations within the areas listed below in order to place conduit, install pull boxes, perform soil samples, and perform surveys for device staking.
* Briley Pkwy, both directions, between I-40 and Centennial Blvd (MM 6 to MM 27)
* I-24, both directions, between Old Hickory Blvd and Bell Rd (MM 40 to MM 61)
* I-40, both directions, between US 70 and Old Hickory Blvd (MM 196 to MM 222)
* I-65, both directions, between Concord Rd and Long Hollow Pkwy (MM 70 to MM 97)
* I-440, both directions, between Hillsboro Pike and I-24 (MM 3 to MM 7)
* Ellington Pkwy, both directions, between Briley Pkwy and Spring St 

•    Thursday June 4 through Wednesday June 10, 8PM-5AM, There will be periodic short term night time lane closures at the following locations to install structure conduit, device foundation installation, DMS foundation installation, and cross bores.

* Briley Pkwy, both directions, between Elm Hill Pike and Brick Church Pike, (MM 7 to MM 27), 3 lanes remain open (multiple locations).
* Briley Pkwy, both directions, between Lebanon Pike and Two Rivers Pkwy, (MM 9 to MM 10), 2 lanes remain open.
1.    Friday 8pm to Monday 5am, 1 left lane closed (median foundation installation).
*Briley Pkwy, both directions, between McGavok Pike and Gallatin Pike, (MM 13 to MM 14), 2 lanes remain open.
2.    Friday 8pm to Monday 5am, 1 left lane closed (median foundation installation).
*I-40, both directions, 1 mile west of Old Hickory Blvd, (MM 197 to MM 198) 2 lanes to remain open.
* I-40, both directions, 1 mile west of White Bridge Pike/Robertson Ave, (MM 201 to MM 202) 2 lanes to remain open.
* I-40, both directions, between Briley Pkwy and Old Hickory Blvd (MM 215 to MM 222), 3 lanes remain open (multiple locations).
* I-65, both directions, between Armory and I-40, (MM 79 to MM 82), 3 lanes remain open.

Sumner County Resurfacing on SR 6 from Lower Station Camp Creek Road  to Lock 4 Road (Rogers Group, Inc.)
•    Thursday June 4 through Wednesday June 10, 8PM-5AM, (excluding Saturday and Sunday), There will be alternating lane closures on S.R. 6 beginning at Lower Station Camp Creek Road and extending to Lock 4 Road in order to fog seal the shoulders of the road.  One lane will remain open.

TDOT Maintenance

•    Thursday  June 4 through Wednesday June 10, 7PM-5AM, (excluding weekend), There will be left lane closures on I-24 from Murfreesboro Road in Davidson County to Hwy 231 in Rutherford County for drain cleaning.

Thomas & Associates
•    Monday June 8 though Wednesday June 10, each day, 2PM, There will be rolling roadblocks on I-24 eastbound and westbound near Waldron Rd. (Exit 64) for blasting. Local police officers will be utilized for this operation.

For real-time updates on all TDOT projects in Tennessee, please visit our website at www.tennessee.gov/tdot and click on the SmartWay logo. For the latest traffic or weather conditions, please call 511 or visit www.TN511.com.










































Important Information About Construction at Nashville International Airport

Terminal Roadway Project at BNA Ramps Up

The Terminal Access Roadway Improvements (TARI) Project is in full swing. TARI is designed to improve traffic conditions on Ring Road, the one-way road that surrounds Nashville International Airport's short- and long-term parking facilities and offers access to the terminal. Phase 1 of TARI commenced in October 2008 and is expected to be completed in the fall of 2009.

Nashville International Airport would like to inform passengers and guests about the following updates regarding driving and parking at the airport:

•    Temporarily, no cell phone/waiting area is available.
•    If waiting for arriving passengers, you may use either the 10-minute waiting area outside the baggage claim area or the short-term parking garage.

•    The terminal entrance off of Donelson Pike, nearest I-40 and adjacent to the Economy Parking Lot, is temporarily closed due to construction. Drivers can still access the Economy Parking Lot from Donelson Pike.

- Note: The main airport entrance off of Donelson Pike, adjacent to the Long-term Parking Lot, remains open.

- Please watch for construction detour and speed limit signs, and stay alert for construction workers.


 
 
 
Tagged under  TDOT



Login and voice your opinion!
Powered by Bondware
Newspaper Software | Email Marketing Tools | E-Commerce Marketplace