• Sidebar Ads




Road Project Update: April 6-10


 Related Articles
Email Print
The following road projects will affect traffic in Murfreesboro during the week beginning April 6: Road conditions are shown every hour on Channel 3. - Traffic will be shifted to the east side (the Dodge’s Store side) of Northwest Broad Street at 2 p.m. Sunday, weather permitting. Two lanes will be available in both directions and a center turning lane between Memorial Boulevard and Vine Street as part of a TDOT bridge replacement project. Protected left turns will be permitted again at Main Street, but avoid the area if possible. Message boards are placed around town to direct motorists around the construction. There are no detour routes. - Median and turn lane work will be performed near Billy Boulevard on Rutherford Boulevard from 9 a.m.-5 p.m. Monday through Friday. Traffic will be reduced to one lane in each direction with traffic control provided by the Murfreesboro Police Department.
 
 
 
Tagged under  Traffic



Login and voice your opinion!
Powered by Bondware
Newspaper Software | Email Marketing Tools | E-Commerce Marketplace